| ADY | GÜRÜN RES PROJESİ 154 kV ENH HATTI İŞLERİ (DIŞ ENERJİ NAKİL HATTI) | Power Transmission and Distribution Lines | 2026-01-28 | 2,628,512.00 $ |
| ADY | GÜRÜN RES PROJESİ 154 kV ENH HATTI İŞLERİ (İÇ ENERJİ NAKİL HATTI) | Power Transmission and Distribution Lines | 2026-01-28 | 2,861,488.00 $ |
| AFYON ÇİMENTO SANAYİ A.Ş. | 1 ADET 154 kV AFYON ÇİMENTO TM (AFYON) (METGRUP) | Operation of Substations | 2025-04-15 | 0.00 $ |
| AKTÜL KAĞIT ÜRETİM PAZARLAMA A.Ş. | 1 ADET 154 KV AKTÜL TEŞVİKİYE KAĞIT TM (İSTANBUL) (METGRUP) | Operation of Substations | 2026-03-01 | 0.00 $ |
| CENGİZ ENERJİ SAN. VE TİC. A.Ş. | TS-E6G-029 / ETİ-6 GES TRAFO MERKEZİ ANAHTAR TESLİM GÖTÜRÜ BEDEL YAPIM SÖZLEŞMESİ | Substations | 2025-09-10 | 3,700,000.00 $ |
| CENGİZ ENERJİ SAN. VE TİC. A.Ş. | TS-E6G-030 / ETi-6 GES ENERJİ İLETİM HATLARI ANAHTAR TESLİM GÖTÜRÜ BEDEL YAPIM SÖZLEŞMESİ | Power Transmission and Distribution Lines | 2025-09-10 | 950,000.00 $ |
| China CAMC Engineering Co., Ltd. - IC İçtaş İnşaat Sanayi ve Ticaret A.Ş. Adi Ortaklığı | KÜTÜKLÜ VE TUZ GÖLÜ GEÇİCİ TRAFO MERKEZLERİNİN İŞLETİLMESİ (AKSARAY) (METGRUP) | Operation of Substations | 2025-04-01 | 0.00 $ |
| ECOWIND 1 ENERJİ A.Ş. | 154 kV PPARMAKÖREN DGES 1X1272 MCM İLETKENLİ, TEK DEVRE ENERJİ İLETİM HATTI | Power Transmission and Distribution Lines | 2026-03-03 | 2,900,000.00 $ |
| ENERJİSA ENERJİ ÜRETİM A.Ş. | FALP RES ELEKTRİK IŞLERİ TASARIM, İNŞAAT,TEDARİK, NAKLİYE, MONTAJ, DEVREYE ALMA İŞLERİ (MET ENERJİ) | Substations | 2025-05-01 | 4,125,903.00 $ |
| ENERJİSA ENERJİ ÜRETİM A.Ş. | GAİA RES ELEKTRİK IŞLERİ TASARIM, İNŞAAT, TEDARİK, NAKLİYE, MONTAJ, DEVREYE ALMA İŞLERİ (MET ENERJİ) | Substations | 2025-05-01 | 4,291,354.00 $ |
| ENERJİSA ENERJİ ÜRETİM A.Ş. | IHLAMUR RES ENERJİ NAKİL HATLARI KALAN İŞLER YAPIM VE DEVREYE ALMA | Power Transmission and Distribution Lines | 2026-03-09 | 2,545,000.00 $ |
| ETİ KROM A.Ş. | 1 ADET 154 kV ETİ KROM TM İŞLETME İŞİ (ELAZIĞ) (METGRUP MÜH.) | Operation of Substations | 2026-03-01 | 0.00 $ |
| FERPA ÇİMENTO A.Ş. | 1 ADET 154 kV FERPA NİĞDE FABRİKASI TM (NİĞDE) (METGRUP) | Operation of Substations | 2025-05-01 | 0.00 $ |
| FIRAT PLASTİK KAUÇUK SAN VE TİC A.Ş. | FIRAT PLASTİK FABRİKASI 154 KV TM İŞLETMESİ (İSTANBUL) (MET ENERJİ | Operation of Substations | 2026-01-01 | 0.00 $ |
| HABAŞ SINAİ VE TIBBİ GAZLAR İSTİHSAL ENDÜSTRİSİ A.Ş. | 400 kV BİÇEROVA GIS İRTİBATLARI EİH YAPIM İŞİ (METGRUP) | Power Transmission and Distribution Lines | 2024-02-26 | 4,550,000.00 $ |
| KÜMAŞ | 1 ADET 154 kV KÜMAŞ TM İŞLETME İŞİ (KÜTAHYA) (METGRUP MÜH.) | Operation of Substations | 2026-03-01 | 0.00 $ |
| RÖNESANS-TOTAL ENERJİ ORTKALIĞI | ÇORUM OSMANCIK RES TM + KABLOLAMA (MET ENERJİ) | Substations | 2025-03-14 | 3,980,997.00 $ |
| YAPI MERKEZİ İNŞAAT VE SANAYİ ANONİM ŞİRKETİ İLE YSE YAPI SANAYİ VE TİCARET ANONİM ŞİRKETİ ADİ ORTAKLIĞI | KIRIKKALE(DELİCE)-ÇORUM(KM:0+000-120+000) KESİMİ YÜKSEK STANDARTLI DEMİRYOLU YAPIM İŞİ KAPSAMINDA BİR KISIM ELEKTRİK İLETİM HATLARI DEPLASE İŞLERİ | Power Transmission and Distribution Lines | 2026-01-02 | 821,947.00 $ |
| YILFERT GEMLİK GÜBRE A.Ş. | 1 ADET 154 kV YILFERT TM İŞLETİLMESİ VE BAKIMI (BURSA) (MET ENERJİ) | Operation of Substations | 2025-06-01 | 0.00 $ |
| ÇİMSA ÇİMENTO SANAYİ VE TİCARET A.Ş. | 1 ADET 154 kV ÇİMSA ESKİŞEHİR FABRİKASI TM (ESKİŞEHİR) (METGRUP) | Operation of Substations | 2025-04-15 | 0.00 $ |