| SAKARYA ELECTRICITY DISTRIBUTION INC. | SEDAŞ 2012/41-04 GRUP KOCAELİ İŞLETMESİ KÖY VE ŞEHİR ŞEBEKELERİ-III | Highway, Tunnel and City Lighting | 2012-07-05 | 466,142.00 $ |
| ANKARA CHAMBER OF INDUSTRY 1ST ORGANIZED INDUSTRY ZONE | 154kV ORGANIZED INDUSTRY 4 PIECES ELECTRICITY PYLON DISPLACEMENT (3 KM 2*795 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2008-03-25 | 260,345.00 $ |
| ANKARA CHAMBER OF INDUSTRY 1ST ORGANIZED INDUSTRY ZONE | 154 KV (2,6 KM) EİH DEPLASMAN YAPIM İŞİ | Power Transmission and Distribution Lines | 2016-04-04 | 853,158.00 $ |
| TCDD (REPUBLIC OF STATE RAILWAYS) | TCDD TRAFO MERKEZLERİNİ BESLEYECEK OLAN ENERJİ NAKİL HATLARININ TEİAŞ KALECİK VE KALABA TM BAĞLANTILARI İÇİN YAPILACAK OLAN 154 kV 2 ADET HAT FİDERİNİN YAPILMASI (İKMAL)İŞİ | Substations | 2020-07-28 | 450,160.00 $ |
| TEİAŞ 8TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ESENBOĞA-OSTİM OSB-MAMAK-ANKARA ÇANKAYA-SANAYİ-KIRIKKALE) | Operation of Substations | 2020-08-31 | 108,907.00 $ |
| TEİAŞ 8TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | TEİAŞ 8TH TRANSMISSION OPERATION OF 4 PİECES OF SUBSTATIONS | Power Generation Plants | 2004-04-16 | 539,645.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 2X3X1272 MCM İLETKENLİ LARAII-SERİK BRŞ N. -LARA I 154 KV EİH (12,5 km) | Power Transmission and Distribution Lines | 2008-07-31 | 2,418,140.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.507 REFERANSLI 154 kV’luk (~82 km) TEK DEVRE 795 MCM İLETKENLİ PINARBAŞI TM– ŞARKIŞLA TM E.İ.H TESİSİ İŞİ | Power Transmission and Distribution Lines | 2014-08-21 | 3,513,730.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H-401 REFERANS NO.LU 1272 MCM VİRANŞEHİR 3TM-KIRLIK EİH | Power Transmission and Distribution Lines | 2012-10-02 | 1,592,180.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.316 ref 380 kVluk (~4,3 km) ÇD 3B 1272 M İlet (Gelibolu-Ünimar) BRŞN-ÇORLU 380 TM, (~2,3 km) ÇD 3B 954 M İlet (Ünimar-Babaeski) BRŞN-ÇORLU 380 TM ve 154 kVluk (~3,7 km) ÇD1272 M İlet ÇORLU 380 TM İRT (Tegesan) Eİ Hatlarının TESİSİ | Power Transmission and Distribution Lines | 2014-10-08 | 3,424,303.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.675 REFERANSLI 154 kV'LUK (~20 km) ÇİFT DEVRE 1272 MCM İLETKENLİ (SORGUN-YOZGAT) BRŞN-YOZGAT 380 EİH TESİS İŞİ | Power Transmission and Distribution Lines | 2018-12-12 | 1,994,012.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 71 - 154 KV KEÇİBORLU TM DISTRIBUTION WORK | Substations | 2011-12-25 | 380,500.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 78 - 154 KV PINARBAŞI TM YAPIM İŞİ | Substations | 2012-10-01 | 718,973.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 78 - 154 KV ALİBEYHÖYÜĞÜ TM YAPIM İŞİ | Substations | 2012-10-01 | 2,929,866.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 78 - 154 KV ŞARKIŞLA TM YAPIM İŞİ | Substations | 2012-10-01 | 692,332.00 $ |
| TEİAŞ GENERAL DIRECTORATE | FFITM 120 - 154 KV VİRANŞEHİR-3 TM YAPIM İŞİ | Operation of Substations | 2014-06-10 | 5,523,890.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 154 KV KELKİT HAVZA TRAFO MERKEZİ | Substations | 2016-02-12 | 2,529,131.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 78 - 154 KV YUKARIMANAHOZ TM YAPIM İŞİ | Substations | 2012-10-01 | 315,160.00 $ |
| ABB ELEKTRİK A.Ş. | ADULARYA 380 KV YUNUSEMRE TM İNŞAAT İŞLERİ | Substations | 2013-03-06 | 1,174,990.00 $ |
| ADAPAZARI SPECIAL PROVINCIAL ADMINISTRATION | GARAJLAR DAĞITIM MERKEZİ DEPLASESİ | City and Rural Electricity Distribution Networks | 2011-06-27 | 177,181.00 $ |
| ADM ELEKTRİK DAĞITIM A.Ş. | AYDIN 5. GRUP ENERJİ NAKİL HATTI TESİS İŞİ | Power Transmission and Distribution Lines | 2015-05-27 | 475,320.00 $ |
| ADM ELEKTRİK DAĞITIM A.Ş. | 3/0 AWG İLETKENLİ (16,10 KM) KALTUN DM-KARAHAYIT-DUTOLUK-KAVŞİT KÖK-ÇATAK-ELDERESİ-İBRAHİM KAVAĞI ENH | Power Transmission and Distribution Lines | 2016-05-16 | 334,629.00 $ |
| ADM ELEKTRİK DAĞITIM A.Ş. | 2X477 MCM İLETKENLİ (16,1 KM) SARAYKÖY DM-PAMUKKALE İM ENH | Power Transmission and Distribution Lines | 2016-05-16 | 651,510.00 $ |
| ADM ELEKTRİK DAĞITIM A.Ş. | 3/0 AWG İLETKENLİ (12,30 KM) KÖŞK DM-BAKLA-KIZILCAYER-MEZE-HÜSEYİNCİLER-UZUNDERE KÖK-KÖSELER-BAŞÇAYIR-KIZILCAKÖY KÖK | Operation of Substations | 2016-05-16 | 300,133.00 $ |
| ADM ELEKTRİK DAĞITIM A.Ş. | 3/0 AWG İLETKENLİ (11,5 KM) ÇİVRİL-YENİKÖY-GÜMÜŞSU ENH TESİSİ | Operation of Substations | 2016-05-16 | 321,209.00 $ |
| AFYON ÇİMENTO SANAYİ A.Ş. | 1 ADET 154 kV AFYON ÇİMENTO TM | Operation of Substations | 2022-03-07 | 106,294.00 $ |
| AK ENERGY - CEZ GROUP SAKARYA ELECTRICITY DISTRIBUTION INC. | SEDAŞ 2012/14-03 GRUP BOLU İŞLETMESİ KÖY VE ŞEHİR ŞEBEKELERİ | Highway, Tunnel and City Lighting | 2012-07-05 | 332,278.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 05.KÖK.07.01-MANAVGAT-KEMER DISTRIBUTION CENTERS WORK | Highway, Tunnel and City Lighting | 2005-11-11 | 583,406.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 06.DŞP.07.24 KEMER LV-MV-ELECTRICITY NETWORK FACILITY | Highway, Tunnel and City Lighting | 2006-08-22 | 729,746.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | GÖYNÜK LV-MV ELECTRICITY NETWORK FACILITY | City and Rural Electricity Distribution Networks | 2007-12-25 | 293,522.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 08.TES.32.16 GRUP NO.LU SAV YOLU GÖLCÜK YOLU ORTA REFUJ AYDINLATMASI İŞİ | City and Rural Electricity Distribution Networks | 2008-12-04 | 213,466.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | ŞARKİKARAAĞAÇ LV-MV MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2004-09-24 | 101,634.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 07.MAINTENANCE REPAIR 07.02.GROUP / ANTALYA BEŞKONAK MANTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2007-03-27 | 65,661.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | FİNİKE-ELMALI OVERHEAD TRANSMISSION LINE (4KM 3/0 AWG CONDUCTOR) | Power Transmission and Distribution Lines | 2004-09-22 | 70,160.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | ANTALYA-CENTER PINARLI TRANSFORMATOR SUBSTATION ALANYA LARA TRANSFORMATOR SUBSTATION OERHEAD TRANSMISSION LINE (5KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2006-04-20 | 163,872.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 06.DŞP.07.30 INSTALLATION OF LV-MV ELECTRICITY NETWORK OF ANTALYA KUMLUCA VILLAGES | Power Transmission and Distribution Lines | 2006-08-22 | 175,221.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | CİHADİYE-KARAÖZ OVERHEAD TRANSMISSION LINE (22KM 2*3/0 AWG CONDUCTOR) | Power Transmission and Distribution Lines | 2006-11-06 | 766,766.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | MANAVGAT GÜNDOĞDU TM-GÜNDOĞDU ENH | Power Transmission and Distribution Lines | 2008-05-26 | 375,492.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | YEŞİLOVA DISTRIBUTION CENTER YARIŞLI-KUMLUCA OVERHEAD TRANSMISSION LINE (30,5KM 3/O AWG CONDUCTOR) | Power Transmission and Distribution Lines | 2005-07-06 | 394,385.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ANTALYA | 05.DŞP.07.69 DÖŞEMALTI LV-MV ELECTRICITY NETWORK FACILITY | Operation of Substations | 2005-11-14 | 415,261.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF BURDUR | AĞLASUN LV-MV ELECTRIC FACILITY | Highway, Tunnel and City Lighting | 2005-07-06 | 428,550.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF BURDUR | AKÜ KÖK-ÜRKÜTLÜ 3/0 İLETKENLİ 30 KM ENH | Power Transmission and Distribution Lines | 2009-07-31 | 402,264.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | YALVAÇ-GELENDOST TOWN-VILLAGE OVERHEAD TRANSMISSION LINE MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2005-09-26 | 216,775.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | 3rd GROUP ULUBORLU-SENİRKENT LV-MV BOI | Maintenance, Failure-Repair | 2004-04-19 | 198,246.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | 1st GROUP YALVAÇ LV-MV MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2004-09-24 | 101,634.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | 06.32.MAINTENANCE REPAIR WORK 02.ISPARTA SÜTÇÜLER MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2006-05-08 | 378,173.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | 2007-04.OVERHEAD TRANSMISSION LINE MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2007-10-03 | 123,569.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | EĞİRDİR SÜTÇÜLER ENH BOİ | Maintenance, Failure-Repair | 2008-04-22 | 184,931.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | KEÇİBORLU KASABA VE KÖYLERİ ELEKTRİK ŞEBEKESİ BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2009-07-14 | 90,547.00 $ |
| AKDENİZ ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF ISPARTA | 06.32.MAINTENANCE REPAIR WORK 01.ISPARTA EĞİRDİR MAINTENANCE REPAIR WORK | Operation of Substations | 2006-05-08 | 363,774.00 $ |
| AKDENİZ ELEKTRİK DAĞITIM A.Ş. | AKDENİZ-TES-02 Grubu, Elmalı - Gömbe ENH (2x477 MCM) ve Batı İlçelerinde (Hisarçandır-Söğütçüm ENH,Dereköy-Sülekler ENH Deplasesi,Lengüme-İkizce Enerji Nakil Hatları) (Kilometrik Bedelli - 3/0 AWG) ile KÖK İrtibatları Elektrik Tesisi (ANTALYA) | Power Transmission and Distribution Lines | 2012-07-13 | 1,626,011.00 $ |
| AKEDAŞ | 2011.46.TES.13 GRUP NO.LU ŞEHİR ŞEBEKESİ TESİSİ İŞİ (K.MARAŞ) | City and Rural Electricity Distribution Networks | 2011-09-06 | 1,429,380.00 $ |
| AKEDAŞ GENERAL DIRECTORATE | 2011.46.TES.13 GRUP NO.LU ŞEHİR ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2011-09-06 | 1,429,380.00 $ |
| AKEDAŞ GENERAL DIRECTORATE | 2011.46.TES.06 GRUP NO.LU ŞEHİR ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2011-07-06 | 1,656,515.00 $ |
| AKEDAŞ ELECTRICITY DISTRIBUTION INC. | 2012.46.TES.13 GRUP NO.LU ŞEHİR ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2012-05-21 | 836,018.00 $ |
| AKEDAŞ ELECTRICITY DITRIBUTION CO. | 2016.02.TES.04 GRUP NO.LU ADIYAMAN İLİ MUHTELİF KÖYLER AG/YG ELEKTRİK TESİS YAPIM | Highway, Tunnel and City Lighting | 2016-07-14 | 1,027,622.00 $ |
| AKEDAŞ ELECTRICITY DITRIBUTION CO. | 2016.02.TES.09 GRUP NO.LU KAHRAMANMARAŞ İLİ MUHTELİF KÖYLER AG/YG ELEKTRİK TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2016-07-14 | 1,413,842.00 $ |
| AKEDAŞ ELECTRICITY DITRIBUTION CO. | 2011.46.TES.08 GRUP NO.LU ŞEHİR ŞEBEKESİ TESİSİ İŞİ | Operation of Substations | 2011-07-06 | 891,540.00 $ |
| AKTÜL KAĞIT ÜRETİM PAZARLAMA A.Ş. | 1 ADET 154 KV AKTÜL TEŞVİKİYE KAĞIT TM (SAKARYA) (MET ENERJİ) | Operation of Substations | 2023-02-01 | 71,729.00 $ |
| ALCEN ELEKTRİK DAĞITIM VE PERAKENDE HİZMETLERİ A.Ş. | KONYA TESİS İŞİ | Highway, Tunnel and City Lighting | 2016-09-07 | 523,314.00 $ |
| ALCEN ELEKTRİK DAĞITIM VE PERAKENDE HİZMETLERİ A.Ş. | SEYDİŞHİR DM - TARAŞÇI KÖK - DM1 İRTİBATI TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2017-02-13 | 396,621.00 $ |
| ALCEN ELEKTRİK DAĞITIM VE PERAKENDE HİZMETLERİ A.Ş. | KARATAY-2 BÜSAN TM BAĞLANTILARI | Highway, Tunnel and City Lighting | 2017-02-13 | 396,621.00 $ |
| ALCEN ELEKTRİK DAĞITIM VE PERAKENDE HİZMETLERİ A.Ş. | KARATAY-2 BÜSAN TM BAĞLANTILARI | Highway, Tunnel and City Lighting | 2017-02-21 | 1,324,400.00 $ |
| ALCEN ELEKTRİK DAĞITIM VE PERAKENDE HİZMETLERİ A.Ş. | EREĞLİ İLÇESİ PLANLI BAKIM İŞLERİ (İŞÇİLİK) | Maintenance, Failure-Repair | 2016-08-27 | 22,518.00 $ |
| ALSTOM POWER HYDRO | 380 KV 2B 2X954 MCM İLETKENLİ BEYHAN HES - BEYHAN TM (2,2 KM) | Power Transmission and Distribution Lines | 2014-01-07 | 1,406,000.00 $ |
| AYDEM ELEKTRİK DAĞITIM A.Ş. | 2012 - 45 TES DENİZLİ 3. GRUP ENH (56 KM 3/0 İLETKENLİ) İŞİ | Power Transmission and Distribution Lines | 2012-06-21 | 888,995.00 $ |
| AYDEM ELEKTRİK DAĞITIM A.Ş. | 2012-46 TES BODRUM - MUĞLA GRUBU ENH (13 KM, 477 MCM İLETKENLİ) | Power Transmission and Distribution Lines | 2012-06-21 | 569,691.00 $ |
| AYDEM/MENDERES ELECTRICITY DISTRIBUTION INC. | MUĞLA-FETHİYE,KEMER,EŞEN,GÖCEK DEFECT REPAIR AND MAINTENANCE | Maintenance, Failure-Repair | 2007-03-26 | 1,278,271.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | ANKARADA BULUNAN UHF ANTEN DİREKLERİ ELEKTRİK VE İNŞAAT İŞLERİ | Highway, Tunnel and City Lighting | 2010-03-18 | 60,014.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | ÇANKAYA-MALTEPE-GÖLBAŞI BOİ | Maintenance, Failure-Repair | 2004-09-08 | 480,707.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | SİNCAN-AYAŞ-B.PAZARI-NALLIHAN MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2004-10-28 | 504,611.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | ÇANKAYA-ALTINDAĞ-KEÇİÖREN MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2005-07-12 | 536,312.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | KAZAN-B.PAZARI-Ş.KOÇHİSAR REGIONAL MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2007-03-21 | 487,944.00 $ |
| BAŞKENT ELECTRICITY DISTRIBUTION INC. | ÇANKAYA-KEÇİÖREN REGIONAL MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2007-05-01 | 899,583.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. | KASTAMONU TESİS İŞİ | Highway, Tunnel and City Lighting | 2013-01-02 | 4,478,780.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. | KASTAMONU KET İŞİ | Operation of Substations | 2013-01-02 | 1,455,604.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK BÖLGE MUHTELİF TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-02-20 | 10,638,581.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | EREĞLİ BÖLGE MUHTELİF TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-02-20 | 7,447,010.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK BÖLGE MUHTELİF KÜÇÜK EK TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2020-01-10 | 1,018,400.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2022 YILI 10. BÖLGE ZONGULDAK-EREĞLİ MUHTELİF TESİS YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2022-03-02 | 4,672,763.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2022 YILI 10. BÖLGE ZONGULDAK-EREĞLİ MUHTELİF KET YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2022-03-02 | 1,222,107.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | BARTIN PLANLI BAKIM SEVİYE-3 | City and Rural Electricity Distribution Networks | 2022-04-18 | 1,394,350.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK-1 PLANLI BAKIM SEVİYE-3 | City and Rural Electricity Distribution Networks | 2022-04-18 | 1,148,670.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK-2 PLANLI BAKIM SEVİYE-3 | City and Rural Electricity Distribution Networks | 2022-04-18 | 1,539,021.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK MUHTELİF TESİS YAPIM İŞİ | Power Transmission and Distribution Lines | 2021-08-19 | 1,179,468.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | BARTIN-1 ENH TESİS İŞİ | Power Transmission and Distribution Lines | 2022-07-27 | 372,843.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK-1 ENH TESİS İŞİ | Power Transmission and Distribution Lines | 2022-07-27 | 2,210,277.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 9. BÖLGE EREĞLİ MUHTELİF KET YAPIM İŞİ (EREĞLİ) | City and Rural Electricity Distribution Networks | 2023-02-09 | 530,676.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 6. BÖLGE ÇANKIRI MUHTELİF KET YAPIM İŞİ (ÇANKIRI) | City and Rural Electricity Distribution Networks | 2023-03-07 | 1,163,153.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 9. BÖLGE EREĞLİ MUHTELİF TESİS YAPIM İŞİ (EREĞLİ) | City and Rural Electricity Distribution Networks | 2023-02-09 | 6,368,110.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 8. BÖLGE ZONGULDAK MUHTELİF KET YAPIM İŞİ (ZONGULDAK) | City and Rural Electricity Distribution Networks | 2023-03-09 | 1,583,314.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 6. BÖLGE ÇANKIRI MUHTELİF TESİS YAPIM İŞİ (ÇANKIRI) | City and Rural Electricity Distribution Networks | 2023-03-07 | 9,516,710.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | 2023 8. BÖLGE ZONGULDAK MUHTELİF TESİS YAPIM İŞİ (ZONGULDAK) | City and Rural Electricity Distribution Networks | 2023-03-09 | 11,610,970.00 $ |
| BAŞKENT ELEKTRİK DAĞITIM A.Ş. (SABANCI HOLDİNG) | ZONGULDAK-1 ENH TESİS İŞİ | Power Generation Plants | 2022-07-20 | 2,210,277.00 $ |
| BORUSAN-ENBW ORTAKLIĞI | 154 kV 1272 MCM İLETKENLİ KORU RES - ÇAN HAVZA TM. E.İ. HATTI (9,7 KM) | Power Transmission and Distribution Lines | 2014-06-15 | 970,000.00 $ |
| BORUSAN-ENBW PARTNERSHIP | 154 kV 2x1272 MCM İLETKENLİ (KARACABEY TM-AKÇALAR TM)BRŞ.- HARMANLIK RES TM E.İ. HATTI (14 KM) | Power Transmission and Distribution Lines | 2014-06-15 | 1,800,000.00 $ |
| BORUSAN-ENBW PARTNERSHIP | 154 kV 2x1272 MCM İLETKENLİ FUAT RES - ( IŞIKLAR-TİRE TM)BRŞ. E.İ. HATTI (20 KM) | Power Transmission and Distribution Lines | 2014-06-15 | 2,833,900.00 $ |
| BORUSAN-ENBW PARTNERSHIP | 154 kV 2x1272 MCM İLETKENLİ MUT RES-( KARAMAN TM - GEZENDE HES TM)BRŞ. E.İ. HATTI (4 KM) | Power Transmission and Distribution Lines | 2014-06-15 | 700,000.00 $ |
| BORUSAN-ENBW PARTNERSHIP | 154 KV (10,5 KM) 1272 MCM İLETKENLİ BALABANLI RES TM - TEGESAN TM EİH. | Power Transmission and Distribution Lines | 2013-06-24 | 891,094.00 $ |
| BOYLAM ENERJİ YATIRIM ÜRETİM TİCARET A.Ş BORUSAN-ENBW ORTAK GİRİŞİMİ | SAROS RES ENERJİ İLETİM HATLARI VE İÇ HATLARI | Power Transmission and Distribution Lines | 2019-09-09 | 4,000,226.00 $ |
| CENGİZ ENERJİ SAN. VE TİC. A.Ş. (CENGİZ HOLDİNG) | 380 KV ( 9,4 KM) 3B 2X954 MCM İLETKENLİ CENGİZ DGKÇS - ÇARŞAMBA ALTINKAYA ENH BRŞ N. E.İ.HATTI | Power Transmission and Distribution Lines | 2013-08-23 | 4,148,850.00 $ |
| CHINA CAMC ENGINEERING CO., LTD. - IC İÇTAŞ İNŞAAT SANAYİ VE TİCARET A.Ş. ADİ ORTAKLIĞI | KÜTÜKLÜ VE TUZ GÖLÜ GEÇİCİ TRAFO MERKEZLERİNİN İŞLETİLMESİ | Operation of Substations | 2021-02-01 | 633,520.00 $ |
| DİCLE ELECTRICITY DISTRUBITION CO. | ŞANLIURFA 3. GRUP 2020 TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2020-03-16 | 1,749,302.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA 4. GRUP 2020 TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2020-03-16 | 1,289,800.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA 1. GRUP 2020 TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2020-03-16 | 1,680,245.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA İLİ VE İLÇELERİ 3.GRUP AG-OG YERALTI TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2019-10-01 | 1,780,247.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | DİCLE EDAŞ ŞANLIURFA İL GENELİ 2015 YILI AG-YG (OG) ,AYDINLATMA ,SAYAÇ VE BAĞLANTI HATLARI GİBİ ELEKTRİK TESİSLERİNİN YAPIM İŞİ | Highway, Tunnel and City Lighting | 2015-06-05 | 6,326,353.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA İLİ VE İLÇELERİ 1.GRUP AG-OG YERALTI TESİS YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2019-06-28 | 2,489,241.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA İLİ VE İLÇELERİ 2.GRUP AG-OG YERALTI TESİS YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2019-07-25 | 1,079,720.00 $ |
| DİCLE ELEKTRİK DAĞITIM A.Ş. | ŞANLIURFA 2.GRUP 2021 YILI AG/OG ELEKTRİK TESİS YAPIM İŞİ (ŞANLIURFA) | City and Rural Electricity Distribution Networks | 2021-02-26 | 2,678,896.00 $ |
| EFİL ENERJİ ÜRETİM TİCARET VE SANAYİ A.Ş. (BORUSAN - ENBW PARTNERSHIP) | 2,6 KM 2X1272 MCM KARTALDAĞI RES ENERJİ İLETİM HATTI VE 5,5 KM 2X477 MCM - 9,1 KM 477 MCM İLETKENLİ RES İÇ HAT TESİSİ | Power Transmission and Distribution Lines | 2016-06-27 | 1,035,000.00 $ |
| ENERJISA BAŞKENT ELECTRICITY DISTRIBUTION INC. (SABANCI HOLDİNG) | POLATLI, KIRIKKALE, ÇUBUK, Ş.KOÇHİSAR, GÖLBAŞI İLÇELERİAG-OG ELEKTRİK ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2010-06-24 | 626,696.00 $ |
| ENERJISA BAŞKENT ELECTRICITY DISTRIBUTION INC. (SABANCI HOLDİNG) | ZONGULDAK BÖLGE MUHTELİF KÜÇÜK EK TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-02-20 | 2,127,720.00 $ |
| ENERJISA BAŞKENT ELECTRICITY DISTRIBUTION INC. (SABANCI HOLDİNG) | EREĞLİ BÖLGE MUHTELİF KÜÇÜK EK TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-02-20 | 1,329,823.00 $ |
| ERDEMİR ENERJİ GENERATION A.Ş. (ERDEMİR DEMİR ÇELİK ) | ERDEMİR KIZILCAPINAR BARAJI HİDROELEKTRİK SANTRALİ PROJESİ ENERJİ NAKİL HATTI YAPILMASI | Power Transmission and Distribution Lines | 2020-08-12 | 119,084.00 $ |
| EÜAŞ | 9 HEPP's | EÜAŞ | 2004-04-20 | 0.00 $ |
| EÜAŞ | 1 ADET HES İŞLETMESİ (BURSA) | Operation of Substations | 2006-03-16 | 140,792.00 $ |
| EÜAŞ GEZENDE OPERATION MANAGEMENT | BOZKIR HES İŞLETMESİ | Power Generation Plants | 2009-07-15 | 241,339.00 $ |
| FERPA ÇİMENTO A.Ş. | 1 ADET 154 kV FERPA NİĞDE FABRİKASI TM | Operation of Substations | 2022-08-01 | 27,223.00 $ |
| FERPA ÇİMENTO A.Ş. | 1 ADET 154 kV FERPA NİĞDE FABRİKASI TM (NİĞDE) (MET ENERJİ) | Operation of Substations | 2023-02-01 | 75,191.00 $ |
| FIRAT PLASTIC CO. | FIRAT PLASTİK FABRİKASI 154 KV TM İŞLETMESİ | Operation of Substations | 2018-02-01 | 79,770.00 $ |
| FIRAT PLASTİK A.Ş. | FIRAT PLASTİK FABRİKASI 154 KV TM İŞLETMESİ | Power Generation Plants | 2015-08-04 | 1,732,890.00 $ |
| FIRAT PLASTİK KAUÇUK SAN VE TİC A.Ş. | FIRAT PLASTİK FABRİKASI 154 KV TM İŞLETMESİ (İSTANBUL) | Operation of Substations | 2017-04-01 | 72,555.00 $ |
| FIRAT PLASTİK KAUÇUK SAN VE TİC A.Ş. | FIRAT PLASTİK FABRİKASI 154 KV TM İŞLETMESİ (İSTANBUL) | Operation of Substations | 2023-01-01 | 74,593.00 $ |
| FUAT RES ENERJİ ÜRETİM A.Ş. (BORUSAN-ENBW) | 154 kV 2X1272 MCM İLETKENLİ MUT RES - (KARAMAN-GEZENDE) BRŞ. N. KESİN KABUL EKSİKLERİNİN GİDERİLMESİ İŞİ | Power Transmission and Distribution Lines | 2019-11-08 | 345,372.00 $ |
| FUAT RES ENERJİ ÜRETİM A.Ş. (BORUSAN-ENBW) | MUT RES VE FUAT RES EİH'LARI TADİLAT İŞLERİ | Power Transmission and Distribution Lines | 2018-11-20 | 156,077.00 $ |
| FİNA HOLDING-ÇANRES ELEKTRİK ÜRETİM A.Ş. | 154kV ÇİFT DEVRE 1272 MCM İLETKENLİ 4,5 KM ŞADILLI RES TM-(MALKARA-GELİBOLU EİH) BRŞ. NOKTASI EİH | Power Transmission and Distribution Lines | 2013-02-07 | 741,729.00 $ |
| FİNA HOLDING-ÇANRES ELEKTRİK ÜRETİM A.Ş. | 154kV 1272 MCM İLETKENLİ 28 KM ŞADILLI RES-KEŞAN TM EİH | Power Transmission and Distribution Lines | 2013-02-07 | 2,203,990.00 $ |
| GALATA WIND ENERJİ A.Ş. | MUT RES EK KAPASİTE ELEKTRİK İŞLERİ (MERSİN) (METGRUP) | Power Generation Plants | 2024-08-14 | 778,000.00 $ |
| GE (GENERAL ELECTRIC) | 380 KV (2,9 KM) YUKARIKALEKÖY HES - YUKARIKALEKÖY TM EİH | Power Transmission and Distribution Lines | 2016-03-04 | 967,228.00 $ |
| GE RENEWABLE ENERGY A.Ş. | YUKARI KALEKÖY HES 2 ADET DİREK MONTAJI VE TEL ÇEKİM İŞİ | Power Transmission and Distribution Lines | 2019-07-25 | 63,014.00 $ |
| GENERAL DIRECTORATE OF TEİAŞ | H-399 REFERANS NO.LU 2X1272 MCM İLETKENLİKONYA2 TM - KONYA 3 TM EİH | Power Transmission and Distribution Lines | 2012-10-05 | 5,196,203.00 $ |
| GES GENEL ELEKTRİK SİSTEMLERİ İNŞAAT VE MÜHENDİSLİK A.Ş. | YUKARIKALEKÖY HES ŞALT VE GANTRY ÇELİK KONSTRÜKSİYON MONTAJ İŞLERİ | Substations | 2016-11-23 | 53,426.00 $ |
| GÖKSU ELECTRICITY DISTRIBUTION INC. | DISMANTLING OF OTL IN THE AREA OF AFŞİN-ELBİSTAN COAL FIRED POWER PLANT AND NEW OTL BUILDING (71KM) | Power Transmission and Distribution Lines | 2008-04-09 | 1,618,580.00 $ |
| GÜRİŞ TAAHHÜT VE MÜHENDİSLİK A.Ş. | 2X477 MCM İLETKENLİ (20 KM) ŞENKÖY RES- ANTAKYA III TM ENH İŞİ | Power Transmission and Distribution Lines | 2011-09-14 | 1,166,510.00 $ |
| ICTAS CONSTRUCTION CO. | DAMLAPINAR HYDROELECTRIC POWER PLANT | Power Transmission and Distribution Lines | 2007-09-24 | 60,797.00 $ |
| INDUSTRY AND TRADE MINISTRY | SİVAS GEMEREK OSB ENH ve AG-OG ŞEBEKE İŞİ | Highway, Tunnel and City Lighting | 2009-07-30 | 643,692.00 $ |
| INOVEN ENTEK ORTAK GİRİŞİMİ (BEREKET ENERJİ) | BODRUM, MİLAS TESİS İŞLERİ YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2021-01-21 | 3,424,103.00 $ |
| INOVEN ENTEK ORTAK GİRİŞİMİ (BEREKET ENERJİ) | BODRUM, MİLAS İLÇELERİ KET NİTELİĞİNDEKİ VE/VEYA ACİL KAYDI TAŞIYAN NİTELİKTEKİ AG-YG ELEKTRİK TESİSLERİNİN YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2021-01-21 | 614,974.00 $ |
| INOVEN ENTEK ORTAK GİRİŞİMİ (BEREKET ENERJİ) | İZMİR 6.BÖLGE(DOĞU-1) BEYDAĞ, KİRAZ, ÖDEMİŞ KET NİTELİĞİNDEKİ VE/VEYA ACİL KAYDI TAŞIYAN NİTELİKTEKİ AG-YG ELEKTRİK TESİSLERİNİN YAPIMI İŞİ | City and Rural Electricity Distribution Networks | 2021-02-09 | 979,821.00 $ |
| INOVEN ENTEK ORTAK GİRİŞİMİ (BEREKET ENERJİ) | İZMİR 6.BÖLGE(DOĞU-1) BEYDAĞ, KİRAZ, ÖDEMİŞ TESİS İŞLERİ YAPIM İŞİ’DİR (AG-YG ELEKTRİK TESİSLERİNİN YAPIMI İŞİ) | City and Rural Electricity Distribution Networks | 2021-02-09 | 7,310,604.00 $ |
| KALEHAN ENERGY GENERATION AND TRADE ÖZALTIN İNŞAAT A.Ş. & CENGİZ | 380 kV 1,37 km 2B 2X954 MCM Aşağı Kaleköy TM - Aşağı Kaleköy HES TM EİH (DOĞU) ve 380 kV 1,61 km Çift Devre 2B 2X954 MCM Aşağı Kaleköy TM - Aşağı Kaleköy HES TM EİH (BATI) | Power Transmission and Distribution Lines | 2019-03-12 | 2,074,510.00 $ |
| KALEHAN ENERGY GENERATION AND TRADE ÖZALTIN İNŞAAT A.Ş. & CENGİZ | 380 KV AŞAĞIKALEKÖY HES- BEYHAN I HES EİH (98-100), (110-117E) ARASI OPGW KORUMA İLETKENİ DEĞİŞİM İŞİ | Power Transmission and Distribution Lines | 2019-10-14 | 102,526.00 $ |
| KALEHAN ENERGY GENERATION AND TRADE ÖZALTIN İNŞAAT A.Ş. & CENGİZ | BEYHAN I BARAJI VE HES (101 km) 380 KV 3B 1272 MCM İLETKENLİ EİH. TESİS İŞİ | Power Transmission and Distribution Lines | 2012-04-30 | 11,461,830.00 $ |
| KALEHAN ENERGY GENERATION AND TRADE ÖZALTIN İNŞAAT A.Ş. & CENGİZ | AŞAĞIKALEKÖY BARAJI 380 KV TRAFO MERKEZİ İNŞAAT İŞLERİ | Substations | 2017-03-06 | 509,093.00 $ |
| KALKAVAN GIDA LTD. ŞTİ. | 154 KV 477 MCM İLETKENLİ MERZİFON KAYABAŞI EİH 26-28 NO.LU DİREKLERİNİN DEPLASE EDİLMESİ İŞİ | Power Transmission and Distribution Lines | 2014-06-20 | 138,458.00 $ |
| KAREN ENERJİ ÜRETİM A.Ş. (KİPAŞ HOLDİNG) | 7 KM 2X477 MCM İLETKENLİ BALKUSAN 1 VE BALKUSAN 2 HES EİH VE 380 KV GEÇİCİ TRAFO MERKEZİ | Substations | 2011-04-13 | 1,662,930.00 $ |
| KAYSERİ VE CİVARI ELEKTRİK DAĞITIM A.Ş. | 10.38.08 GRUP NO.LU YAHYALI, DEVELİ YEŞİLHİSAR AG OG ELEKTRİK ŞEBEKESİ VE ENH İŞLERİ | City and Rural Electricity Distribution Networks | 2010-04-26 | 830,578.00 $ |
| KESİR ENGINEERING - ALARKO | 154 KV KARAKUZ BARAJI ŞALT SAHASI - SANTRAL BAĞLANTI E.İ.H | Power Transmission and Distribution Lines | 2013-07-16 | 97,500.00 $ |
| KONTROLMATİK TEKNOLOJİ ENERJİ VE MÜHENDİSLİK A.Ş. | BLACKGREEN 154 kV GÜMÜŞPINAR FERROKROM 154 kV TRAFO MERKEZİNİN İŞLETİLMESİ VE BAKIMI (BURSA) (MET ENERJİ) | Operation of Substations | 2024-02-13 | 136,866.00 $ |
| KOVANLIK ENERJİ ÜRETİM A.Ş. | 154 KV 1272 MCM İLETKENLİ (10,3 KM) KOVANLIK HES TM -KOVANLIK HAVZA TM | Power Transmission and Distribution Lines | 2020-01-03 | 1,245,000.00 $ |
| LOTUS ENERJİ FZE | PELWERT - ATAMURAT 220 KV 795 MCM İLETKENLİ EİH (120 KM) TESİS İŞİ (TÜRKMENİSTAN) | Power Transmission and Distribution Lines | 2012-03-08 | 4,398,670.00 $ |
| MBD BUILDING LIMITED COMPANY | 3*477 MCM CONDUCTOR DOĞANKÖY TS-KALEALTI REG. OVERHEAD TRANSMISSION LINE (18KM 477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2007-07-18 | 1,253,030.00 $ |
| MCK ELEKTRİK ÜRETİM A.Ş. (BM HOLDING) | 154 KV 2X1272 MCM İLETKENLİ DEVECİ KONAĞI BARAJI EİH (3,3 KM) TESİS İŞİ | Power Transmission and Distribution Lines | 2012-02-22 | 528,122.00 $ |
| MERAM ELECTRICITY DISTRIBUTION INC. (ALARKO-CENGİZ HOLDİNG) | AKSARAY-1,HACIBEKTAŞ, NEVŞEHİR-2, NİĞDE-2, ÜRGÜP İŞLETME , ONARIM İŞLERİ | Highway, Tunnel and City Lighting | 2020-04-01 | 4,185,980.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDING) | EREĞLİ AG-OG ŞEHİR ŞEBEKESİ KÜÇÜK EK TESİS İŞİ | Highway, Tunnel and City Lighting | 2011-12-01 | 173,223.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDING) | MERAM BÖLGESİ ELEKTRİK ŞEBEKESİ BAKIM İŞİ | Maintenance, Failure-Repair | 2010-07-22 | 2,893,620.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | BOZKIR-ERMENEK AG-OG ŞEHİR ŞEBEKESİ TESİS İŞİ | Highway, Tunnel and City Lighting | 2011-04-05 | 281,019.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | HADİM AG - OG ELEKTRİK ŞEBEKESİ TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2013-06-21 | 762,407.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | HADİM (PAKET-2) AG - OG ELEKTRİK ŞEBEKESİ TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2013-08-23 | 490,036.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM BÖLGESİ ELEKTRİK ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2010-09-22 | 2,441,490.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | KONYA İLİ MERAM İLÇESİ 15,8kV / 31,5 kV DÖNÜŞÜM TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2012-06-26 | 934,992.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ, KARAPINAR, EMİRGAZİ BÖLGELERİ AG - OG ELEKTRİK ŞEBEKESİ TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2012-08-10 | 1,121,946.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM -1 BÖLGESİ TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2016-04-27 | 1,283,337.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | HADİM BÖLGESİ TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2016-06-13 | 1,013,671.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM BÖLGESİ (PAKET 3) TESİS YAPIM İŞİ | Highway, Tunnel and City Lighting | 2015-03-27 | 673,248.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | KARAPINAR KÜÇÜK EK TESİS İŞİ | Highway, Tunnel and City Lighting | 2012-05-17 | 180,221.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | BOZKIR-ERMENEK AG-OG ŞEHİR ŞEBEKESİ BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2011-04-11 | 1,012,340.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | SELÇUKLU BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2010-05-03 | 6,652,262.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ-KARAPINAR AG-OG ŞEHİR ŞEBEKESİ BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2011-11-01 | 521,767.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | SARAYÖNÜ BÖLGE İŞL.MÜH. ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2012-06-16 | 558,347.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ İLÇESİ PLANLI BAKIM İŞLERİ (MALZEME) | Maintenance, Failure-Repair | 2016-08-27 | 86,846.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | HADİM BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2016-04-01 | 378,445.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM-1 BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2017-12-28 | 901,294.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM-1 / NİĞDE-2 / SELÇUKLU-1 BÖLGELERİ ARIZA ONARIM ve BAKIM İŞLERİ | Maintenance, Failure-Repair | 2013-12-31 | 3,123,710.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | NEVŞEHİR-2 BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2016-04-01 | 402,297.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | ÜRGÜP BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2016-04-01 | 484,982.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | NEVŞEHİR-2 BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2017-12-28 | 1,019,835.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | ÜRGÜP BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2017-12-28 | 1,270,090.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | NİĞDE-2 BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2016-04-01 | 461,131.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | NİĞDE-2 BÖLGESİ ARIZA ONARIM İŞİ | Maintenance, Failure-Repair | 2017-12-28 | 1,117,052.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | 5. GRUP (KULU, ALTINEKİN, CİHANBEYLİ) ENH İŞLERİ (58 KM 3/0 VE 3 SW İLETKENLİ) | Power Transmission and Distribution Lines | 2012-06-22 | 1,278,255.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | BEYŞEHİR BÖLGESİ (PAKET 3) TESİS YAPIM İŞİ | Operation of Substations | 2015-03-27 | 794,215.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | SEYDİŞEHİR BÖLGESİ (PAKET 3) TESİS YAPIM İŞİ | Operation of Substations | 2015-03-27 | 203,926.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | 4. GRUP (BEYŞEHİR, BOZKIR HADİM) ENH İŞLERİ (80 KM 3/0 VE 3 SW İLETKENLİ) | Operation of Substations | 2012-06-22 | 1,659,400.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ 1 KÜÇÜK EK TESİS İŞİ | City and Rural Electricity Distribution Networks | 2012-05-17 | 303,116.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM-1 BÖLGESİ ARIZA ONARIM İŞİ | Operation of Substations | 2016-04-01 | 327,562.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | MERAM 1 BÖLGE İŞL.MÜH. ARIZA ONARIM İŞİ | Operation of Substations | 2012-06-16 | 966,306.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | SELÇUKLU 1 BÖLGE İŞL.MÜH. ARIZA ONARIM İŞİ | Operation of Substations | 2012-06-16 | 1,039,600.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ 2 BÖLGE İŞL.MÜH. ARIZA ONARIM İŞİ | Operation of Substations | 2012-06-16 | 829,045.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | KARAPINAR BÖLGE İŞL.MÜH. ARIZA ONARIM İŞİ | Operation of Substations | 2012-06-16 | 704,542.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | EREĞLİ BÖLGESİ ARIZA ONARIM İŞİ | Operation of Substations | 2010-05-03 | 4,620,530.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | AKSARAY-1, HACIBEKTAŞ, NEVŞEHİR-2, NİĞDE-2, ÜRGÜP BÖLGELERİ ELEKTRİK DAĞITIM ŞEBEKESİ BAKIM ONARIM İŞİ (AKSARAY, NEVŞEHİR, NİĞDE) " | Maintenance, Failure-Repair | 2023-04-12 | 162,464.00 $ |
| MERAM ELEKTRİK DAĞITIM A.Ş. (ALARKO-CENGİZ HOLDİNG) | AKSARAY-1,HACIBEKTAŞ, NEVŞEHİR-2, NİĞDE-2, ÜRGÜP İŞLETME , ONARIM İŞLERİ 2022 (AKSARAY, NEVŞEHİR, NİĞDE) | City and Rural Electricity Distribution Networks | 2022-04-01 | 4,125,891.00 $ |
| MINISTRY OF INDUSTRY AND TRADE | KADİRLİ OIZ LW-MW NETWORK AND OTL FACILITY | Highway, Tunnel and City Lighting | 2005-09-09 | 425,993.00 $ |
| OMV SAMSUN ELEKTRİK ÜRETİM A.Ş. | 1 ADET 380 KV TRAFO MERKEZİ İŞLETMESİ (OMV ÜNYE DGÇS) | Power Generation Plants | 2016-11-01 | 263,334.00 $ |
| OMV SAMSUN ELEKTRİK ÜRETİM A.Ş. | 1 ADET 380 KV TRAFO MERKEZİ İŞLETMESİ (OMV ÜNYE DGÇS) | Power Generation Plants | 2014-09-24 | 259,750.00 $ |
| OSMANGAZİ ELECTRICITY DISTRIBUTION INC. (ZORLU ENERJİ A.Ş.) | AFYONKARAHİSAR İLİ 1. GRUP ENH ELEKTRİK TESİSİ YAPIM İŞİ | Highway, Tunnel and City Lighting | 2017-05-29 | 2,026,130.00 $ |
| OSMANGAZİ ELECTRICITY DISTRIBUTION INC. (ZORLU ENERJİ A.Ş.) | AFYONKARAHİSAR İLİ A-03 GRUP AG-YG KÖK ENH ELEKTRİK TESİSLERİ YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-05-03 | 1,798,850.00 $ |
| OSMANGAZİ ELECTRICITY DISTRIBUTION INC. (ZORLU ENERJİ A.Ş.) | AFYONKARAHİSAR İLİ A-06 GRUP AG-YG KÖK ENH ELEKTRİK TESİSLERİ YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-05-03 | 1,813,346.00 $ |
| OSMANGAZİ ELECTRICITY DISTRIBUTION INC. (ZORLU ENERJİ A.Ş.) | AFYONKARAHİSAR İLİ A-07 GRUP AG-YG KÖK ENH ELEKTRİK TESİSLERİ YAPIM İŞİ | Highway, Tunnel and City Lighting | 2018-05-08 | 1,700,385.00 $ |
| OSMANGAZİ ELECTRICITY DISTRIBUTION INC. (ZORLU ENERJİ A.Ş.) | AFYONKARAHİSAR İLİ 1. GRUP AG+YG+AYDINLATMA ELEKTRİK TESİSİ YAPIM İŞİ | Highway, Tunnel and City Lighting | 2017-05-29 | 4,254,603.00 $ |
| PARK TEKNİK ELEKTRİK MADENCİLİK TURİZM SANAYİ VE İŞLETME A.Ş. | ELBİSTAN B TERMİK TM-ÇÖLLOLAR TM 154KV 2X795 MCM İLETKENLİ EİH | Power Transmission and Distribution Lines | 2009-05-11 | 926,342.00 $ |
| SAKARYA ELECTRICITY DISTRIBUTION INC. | 2017 SEDAŞ 14.Prj/01 GRUP NO.LU BOLU VE BAĞLILARI AG-OG ELEKTİRK TESİSİ DAĞITIM ŞEBEKE YAPIM İŞİ | City and Rural Electricity Distribution Networks | 2017-12-07 | 2,008,770.00 $ |
| SAKARYA ELECTRICITY DISTRIBUTION INC. | 2012/54-02 SAKARYA İŞLETMESİ KÖY VE ŞEHİR ŞEBEKELERİ I.AG+OG ELEKTRİK TESİS YAPIM İŞLERİ II | Highway, Tunnel and City Lighting | 2012-03-13 | 777,067.00 $ |
| SEDAŞ GENERAL DIRECTORATE | SEDAŞ - 2008/04 : SAKARYA PROVINCE NETWORKS - I. INSTALLATION OF LW-MV ELECTRICITY NETWORK | Highway, Tunnel and City Lighting | 2008-04-17 | 9,779,000.00 $ |
| SEDAŞ GENERAL DIRECTORATE | KOCAELİ KET | Highway, Tunnel and City Lighting | 2011-03-02 | 583,857.00 $ |
| SEDAŞ GENERAL DIRECTORATE | KOCAELİ DAĞ HATTI DEMONTAJ | Power Transmission and Distribution Lines | 2011-06-17 | 10,833.00 $ |
| SEDAŞ PROVINCIAL DIRECTORATE OF SAKARYA | KARASU İHSANİYE KÜÇÜK EK TESİSLER | Highway, Tunnel and City Lighting | 2009-07-09 | 224,979.00 $ |
| SEFERİHİSAR ENERJİ A.Ş. (EKSİM HOLDİNG) | SEFERİHİSAR RES ELEKTRİK İNŞAAT ALTYAPI İŞLERİ | Power Generation Plants | 2016-05-10 | 631,809.00 $ |
| STATE HYDRAULIC AFFAIRS 10th REGIONAL DIRECTORATE | P 5-P 7 PUMP STATIONS OVERHEAD TRANSMISSION LINE (30,6KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2005-01-03 | 1,100,020.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ARDEŞEN, MURGUL, G.MEYDANCIK, RİZE, ARDANUÇ, ALANBAŞI) | Operation of Substations | 2020-08-31 | 110,956.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (TİREBOLU TM) | Operation of Substations | 2020-08-31 | 41,404.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (TİREBOLU TM) | Power Generation Plants | 2019-07-31 | 167,350.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (TİREBOLU TM) | Power Generation Plants | 2020-07-03 | 13,100.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ARDEŞEN, ÇAKMAKKAYA, G.MEYDANCIK, RİZE, ARDANUÇ, ALANBAŞI) | Power Generation Plants | 2018-12-31 | 102,268.00 $ |
| TEİAS 14th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ARDEŞEN, MURGUL, G.MEYDANCIK, RİZE, ARDANUÇ, ALANBAŞI) | Power Generation Plants | 2020-04-30 | 152,332.00 $ |
| TEİAS 2nd REGIONAL DIRECTORATE | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Operation of Substations | 2020-08-31 | 116,286.00 $ |
| TEİAS 2nd REGIONAL DIRECTORATE | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Power Generation Plants | 2018-10-19 | 420,233.00 $ |
| TEİAS 2nd REGIONAL DIRECTORATE | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Power Generation Plants | 2019-10-31 | 172,555.00 $ |
| TEİAS 2nd REGIONAL DIRECTORATE | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Power Generation Plants | 2020-02-28 | 93,025.00 $ |
| TEİAS 2nd REGIONAL DIRECTORATE | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Power Generation Plants | 2020-04-29 | 164,582.00 $ |
| TEİAS 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ(KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE;DUDULLU, DUDULLU METRO GIS AHMET GENCAN, BÜYÜKBAKKALKÖY) | Operation of Substations | 2020-08-28 | 129,594.00 $ |
| TEİAS 4th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (PAŞAKÖY CAHİT ZİREK TM) | Operation of Substations | 2020-08-28 | 41,606.00 $ |
| TEİAS 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL, KURTKÖY,TUZLA,ÇOLAKOĞLU,İÇMELER ve GEBZE OSB+ K. BAKKALKÖY) | Power Generation Plants | 2015-08-04 | 1,732,890.00 $ |
| TEİAS 4th REGIONAL DIRECTORATE | 3 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE) | Power Generation Plants | 2018-11-12 | 450,976.00 $ |
| TEİAS 6th REGIONAL DIRECTORATE | 7 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL, GÖLPAZARI) | Operation of Substations | 2020-08-31 | 133,639.00 $ |
| TEİAS 6th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (TUNÇBİLEK TM) | Operation of Substations | 2020-08-31 | 42,360.00 $ |
| TEİAS 9th REGIONAL DIRECTORATE | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ÇUMRA, KONYA-2 , KONYA-1, ERENKÖY GIS) | Operation of Substations | 2020-08-28 | 81,850.00 $ |
| TEİAS GENERAL DIRECTORATE | H643TREF 154KV;1272MCM(~32,7KM)ALAŞEHİR HAVZA TM-SALİHLİ,1272MCM(~41,9KM) SALİHLİ-BAĞYURDU,2X127MCM(~5,4KM) (SALİHLİ-BAĞYURDU)BRŞN-DERBENT EİH - 2X1272MCM(~2,1KM)(ALAŞEHİR HAVZA-SALİHLİ)BRŞN-SALİHLİ OSB EİH TESİS İŞİ | Power Transmission and Distribution Lines | 2020-06-17 | 4,859,020.00 $ |
| TEİAŞ 10 TRANSMISSION FACILITIES AND OP. GROUP DIRECTORATE (SAMSUN) | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (SAMSUN 2-SAMSUN3-ÜNYE-ORDU-GÖLKÖY-AKKUŞ-) | Operation of Substations | 2020-08-27 | 110,068.00 $ |
| TEİAŞ 10 İLETİM TESİS VE İŞL. GRUP MÜD. (SAMSUN) | 154 kV EİH BAKIM ONARIM İŞİ (SAMSUN) 2.GRUP | Maintenance, Failure-Repair | 2009-02-02 | 468,217.00 $ |
| TEİAŞ 10. BÖLGE MÜDÜRLÜĞÜ | 6 AY SÜRELİ SAMSUN BÖLGESİ 15 ADET 154 KV, 2 ADET 400 KV T.M. (BAKIM VE GÜVENLİK HİZMETLERİ HARİÇ) İŞLETİLMESİ HİZMET ALIMI İŞİ (SAMSUN) | Operation of Substations | 2021-11-05 | 552,411.00 $ |
| TEİAŞ 10. BÖLGE MÜDÜRLÜĞÜ | 2 AY SÜRELİ SAMSUN BÖLGESİ 15 ADET 154 KV, 2 ADET 400 KV T.M. (BAKIM VE GÜVENLİK HİZMETLERİ HARİÇ) İŞLETİLMESİ HİZMET ALIMI İŞİ (SAMSUN) | Operation of Substations | 2022-04-25 | 197,970.00 $ |
| TEİAŞ 10. BÖLGE MÜDÜRLÜĞÜ | 1 AY SÜRELİ SAMSUN BÖLGESİ 15 ADET 154 KV, 2 ADET 400 KV T.M. (BAKIM VE GÜVENLİK HİZMETLERİ HARİÇ) İŞLETİLMESİ HİZMET ALIMI İŞİ (SAMSUN) | Operation of Substations | 2022-06-30 | 94,713.00 $ |
| TEİAŞ 10. İLETİM TESİS VE İŞLETME GRUP MÜDÜRLÜĞÜ | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ÇORUM-1,ÇORUM-2,SUNGURLU OSB, YENİDERE HAVZA, AMASYA, BAYAT) | Operation of Substations | 2020-08-27 | 110,068.00 $ |
| TEİAŞ 10TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 4 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ(GÖLKÖY-SAMSUN3-ÜNYE+ORDU) | Power Generation Plants | 2013-12-06 | 1,125,300.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ÇORUM-1,ÇORUM-2,SUNGURLU OSB, YENİDERE HAVZA, AMASYA, BAYAT) | Power Generation Plants | 2020-04-30 | 141,319.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ÇORUM-1,ÇORUM-2,SUNGURLU OSB, YENİDERE HAVZA, AMASYA, BAYAT) | Power Generation Plants | 2016-10-31 | 1,511,883.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ÇORUM-1,ÇORUM-2,SUNGURLU OSB, YENİDERE HAVZA, AMASYA, BAYAT) | Power Generation Plants | 2020-02-27 | 77,143.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 4 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (GÖLKÖY-SAMSUN3-ÜNYE+ORDU-AKKUŞ-SAMSUN II) | Power Generation Plants | 2017-01-19 | 1,002,910.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (GÖLKÖY-SAMSUN3-ÜNYE+ORDU-AKKUŞ-SAMSUN II) | Power Generation Plants | 2020-02-27 | 77,143.00 $ |
| TEİAŞ 10th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (SAMSUN 2-SAMSUN3-ÜNYE-ORDU-GÖLKÖY-AKKUŞ) | Power Generation Plants | 2020-04-30 | 141,319.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ (SAMSUN) 1. GRUP | Maintenance, Failure-Repair | 2009-02-02 | 468,217.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154kV OTL PERIODIC MAINTENANCE AND REPAIR WORK/ SAMSUN | Maintenance, Failure-Repair | 2006-08-29 | 208,740.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ 2.GRUP | Maintenance, Failure-Repair | 2013-06-17 | 526,741.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | I.KISIM 154KV 2X795 MCM İLETKENLİ ÇARŞAMBA-ÜNYE/ÇARŞAMBA-FATSA EİH NIN 190-191 NOLU DİREKLERİNİN DEPLASE EDİLMESİ | Power Transmission and Distribution Lines | 2012-05-09 | 67,630.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154kV AND 380kV OVERHEAD TRANSMISSION LINES WARNING SPHERES MONTAGE | Power Transmission and Distribution Lines | 2008-04-14 | 239,322.00 $ |
| TEİAŞ 10th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | OPERATION OF 4 PIECES OF 154 KV SUBSTATION | Power Generation Plants | 2005-08-02 | 905,788.00 $ |
| TEİAŞ 11th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 1 ADET 380 KV TRAFO MERKEZİ İŞLETMESİ | Power Generation Plants | 2011-07-08 | 542,674.00 $ |
| TEİAŞ 11th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ | Power Generation Plants | 2009-05-15 | 1,362,080.00 $ |
| TEİAŞ 11th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (KAYSERİ-SİVAS-YOZGAT) | Power Generation Plants | 2010-10-24 | 1,570,644.00 $ |
| TEİAŞ 13th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (MALATYA-MALORSAHASANÇELEBİ-ELAZIĞ-FERROKROM) | Power Generation Plants | 2011-01-12 | 960,197.00 $ |
| TEİAŞ 14th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ARDEŞEN, ÇAKMAKKAYA, G.MEYDANCIK, RİZE, ARDANUÇ, ALANBAŞI) | Power Generation Plants | 2019-03-27 | 503,630.00 $ |
| TEİAŞ 14th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 4 ADET 154 kV TRAFO MERKEZİ İŞLETMESİ (ARTVİN-Y.MANAHOZ-VAKFI KEBİR-ÇIRAKDAMI) | Power Generation Plants | 2013-12-19 | 1,150,800.00 $ |
| TEİAŞ 15th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 4 ADET 154kV TEİAŞ TRAFO MERKEZLERİNİN İŞLETMESİ (PÜLÜMÜR-TERCAN-REFAHİYE-BAYBURT-ERZURUM-2) | Power Generation Plants | 2012-06-04 | 1,008,483.00 $ |
| TEİAŞ 15th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (KARS1-TORTUM-OLUR HAVZA) | Power Generation Plants | 2012-06-04 | 786,544.00 $ |
| TEİAŞ 1st TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 4 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (BAHÇEŞEHİR-TAŞOLUK-SİLAHTAR-ALTINTEPE) | Power Generation Plants | 2012-06-12 | 1,046,040.00 $ |
| TEİAŞ 2. BÖLGE MÜDÜRLÜĞÜ | 5 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (AKÇALAR,KARACABEY,GÖBEL,BANDIRMA3,ERDEK, GÖNEN) | Operation of Substations | 2015-09-17 | 1,243,500.00 $ |
| TEİAŞ 2. TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | ENH İB / 8.2.1 GRUBU EİH PERİODİK BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2013-06-20 | 413,187.00 $ |
| TEİAŞ 22. BÖLGE MÜDÜRLÜĞÜ | 29 AY SÜRELİ TMİ/3-22 GRUBU 18 ADET 154 KV, 1 ADET 400 KV T.M. (BAKIM VE GÜVENLİK HİZMETLERİ HARİÇ) İŞLETİLMESİ HİZMET ALIMI İŞİ | Operation of Substations | 2021-05-20 | 3,231,500.00 $ |
| TEİAŞ 2nd TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2009-07-09 | 448,548.00 $ |
| TEİAŞ 3. BÖLGE MÜDÜRLÜĞÜ | 3EİH10 - 400 KV (~1,1 KM) TEK DEVRE 3B 954 MCM İLETKENLİ İZDEMİR TES - BORNOVA GİS İRTİBATI EİH TESİS YAPIM İŞİ. (İZMİR) | Power Transmission and Distribution Lines | 2021-05-24 | 334,768.00 $ |
| TEİAŞ 3rd TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ALİAĞA 1 - BOZYAKA - KARABAĞLAR - ILICASU GIS - PANCAR) | Power Generation Plants | 2012-09-19 | 1,304,510.00 $ |
| TEİAŞ 4. BÖLGE MÜDÜRLÜĞÜ (ÜMRANİYE-İSTANBUL) | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL KEMAL AKDAĞ GİS, ÇOLAKOĞLU, KURTKÖY, GEBZE OSB ,İÇMELER, ,TUZLA ) (İSTANBUL) | Operation of Substations | 2020-08-28 | 130,958.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY, SELİMİYE, SOĞANLIK, KADIKÖY, CUMHURİYET GİS, BEYKOZ TM) | Operation of Substations | 2020-08-28 | 125,501.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL KEMAL AKDAĞ GİS, ÇOLAKOĞLU, KURTKÖY, GEBZE OSB ,İÇMELER, ,TUZLA ) | Power Generation Plants | 2015-08-04 | 1,167,854.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE) | Power Generation Plants | 2018-11-12 | 245,640.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (DUDULLU, DUDULLU METRO GIS AHMET GENCAN, BÜYÜKBAKKALKÖY) | Power Generation Plants | 2018-11-12 | 219,740.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ(KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE) | Power Generation Plants | 2019-11-15 | 67,101.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (DUDULLU, DUDULLU METRO GIS AHMET GENCAN, BÜYÜKBAKKALKÖY ) | Power Generation Plants | 2019-11-15 | 59,298.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL KEMAL AKDAĞ GİS, ÇOLAKOĞLU, KURTKÖY, GEBZE OSB ,İÇMELER, TUZLA) | Power Generation Plants | 2019-11-15 | 121,720.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ(KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE;DUDULLU, DUDULLU METRO GIS AHMET GENCAN, BÜYÜKBAKKALKÖY) | Power Generation Plants | 2020-02-28 | 88,415.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL KEMAL AKDAĞ GİS, ÇOLAKOĞLU, KURTKÖY, GEBZE OSB ,İÇMELER, ,TUZLA ) | Power Generation Plants | 2020-02-28 | 88,478.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (PAŞAKÖY CAHİT ZİREK TM) | Power Generation Plants | 2019-06-12 | 174,282.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ(KÜÇÜKBAKKALKÖY, GÖZTEPE, MALTEPE;DUDULLU, DUDULLU METRO GIS AHMET GENCAN, BÜYÜKBAKKALKÖY) | Power Generation Plants | 2020-04-29 | 167,123.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (KARTAL KEMAL AKDAĞ GİS, ÇOLAKOĞLU, KURTKÖY, GEBZE OSB ,İÇMELER, ,TUZLA ) | Power Generation Plants | 2020-04-29 | 167,843.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 1 ADET 400 kV TRAFO MERKEZİ İŞLETMESİ (PAŞAKÖY CAHİT ZİREK TM) | Power Generation Plants | 2020-06-09 | 28,598.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY, SELİMİYE, SOĞANLIK, KADIKÖY, CUMHURİYET GİS, BEYKOZ TM) | Power Generation Plants | 2019-11-15 | 113,916.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ, ŞİLE VE İSAKÖY) | Power Generation Plants | 2017-03-27 | 963,521.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY, SELİMİYE, SOĞANLIK, KADIKÖY, CUMHURİYET GİS, BEYKOZ TM) | Power Generation Plants | 2020-02-28 | 83,528.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ, ŞİLE VE İSAKÖY) | Power Generation Plants | 2020-02-28 | 25,574.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (MAKİNE OSB) | Power Generation Plants | 2017-05-23 | 675,984.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY, SELİMİYE, SOĞANLIK, KADIKÖY, CUMHURİYET GİS, BEYKOZ TM) | Power Generation Plants | 2020-04-29 | 156,850.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ, ŞİLE VE İSAKÖY) | Power Generation Plants | 2020-04-29 | 92,432.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (MAKİNE OSB) | Power Generation Plants | 2020-06-09 | 38,620.00 $ |
| TEİAŞ 4th REGIONAL DIRECTORATE | 5 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY, SELİMİYE, SOĞANLIK, KADIKÖY, CUMHURİYET GİS, BEYKOZ TM) | Power Generation Plants | 2016-11-11 | 1,597,882.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (VANİKÖY-SELİMİYE-SOĞANLIK) | Power Generation Plants | 2010-08-27 | 898,891.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ-ŞİLE-BEYKOZ) | Power Generation Plants | 2010-12-24 | 754,329.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ-(KARTAL-KURTKÖY-TUZLA) | Power Generation Plants | 2012-05-29 | 775,382.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 5 ADET 154kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ-(B.BAKKALKÖY-DUDULLU-GÖZTEPE GIS-GEBZE GIS-İÇMELER) | Power Generation Plants | 2012-05-29 | 1,264,043.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ, ŞİLE VE İSAKÖY ) | Power Generation Plants | 2013-12-23 | 859,230.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (MAKİNE OSB) | Power Generation Plants | 2013-12-24 | 619,681.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE (ÜMRANİYE-İSTANBUL) | 3 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (DİLİSKELESİ, ŞİLE VE İSAKÖY) | Operation of Substations | 2020-04-29 | 75,708.00 $ |
| TEİAŞ 4th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE (ÜMRANİYE-İSTANBUL) | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (MAKİNE OSB) | Operation of Substations | 2020-08-28 | 41,606.00 $ |
| TEİAŞ 6. İLETİM TESİS VE İŞLETME GRUP MÜDÜRLÜĞÜ | 6 ADET 154kV (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL TRAFO) | Power Generation Plants | 2012-04-27 | 1,314,600.00 $ |
| TEİAŞ 6TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2009-07-17 | 571,820.00 $ |
| TEİAŞ 6TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2012-10-01 | 323,398.00 $ |
| TEİAŞ 6TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 154 kV EİH BAKIM ONARIM İŞİ | Maintenance, Failure-Repair | 2014-11-05 | 52,598.00 $ |
| TEİAŞ 6TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | EMET-KÜTAHYA-YENİGEDİZ-UŞAK T.M İŞLETMESİ | Power Generation Plants | 2011-04-14 | 1,042,450.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 6 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL) | Power Generation Plants | 2015-07-24 | 1,642,615.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 6 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL) | Power Generation Plants | 2018-09-25 | 365,390.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 6 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL) | Power Generation Plants | 2019-10-16 | 34,075.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 6 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL) | Power Generation Plants | 2019-11-15 | 112,668.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 6 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL) | Power Generation Plants | 2020-02-27 | 77,142.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 7 ADET 154 kV TRAFO MERKEZLERİNİN İŞLETMESİ (ALTINTAŞ, BİLORSA, KIRKA, SİMAV , ESKİŞEHİR 2 ve KÜMBET MOBİL, GÖLPAZARI) | Power Generation Plants | 2020-04-29 | 169,985.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (TUNÇBİLEK TM) | Power Generation Plants | 2018-12-14 | 143,885.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (TUNÇBİLEK TM) | Power Generation Plants | 2020-02-27 | 18,677.00 $ |
| TEİAŞ 6th REGIONAL DIRECTORATE | 1 ADET 380 kV TRAFO MERKEZİ İŞLETMESİ (TUNÇBİLEK TM) | Power Generation Plants | 2020-04-29 | 54,981.00 $ |
| TEİAŞ 7th TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 477 MCM İLETKENLİ KOVADA I - KOVADA II E.İ.H. VE EĞİRDİR - BARLA T.M E.İ.HATLARINDA 7 ADET DİREK MONTAJI VE TEL ÇEKİMİ | Power Transmission and Distribution Lines | 2010-03-29 | 155,149.00 $ |
| TEİAŞ 8 İLETİM TESİS VE İŞL. GRUP MÜD. (ANKARA) | 4 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ANKARA) | Power Generation Plants | 2009-04-22 | 1,057,960.00 $ |
| TEİAŞ 8TH TRANSMISSION FACILITIES AND OPERATION GROUP DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ESENBOĞA-OSTİM OSB-MAMAK-ANKARA ÇANKAYA-SANAYİ-KIRIKKALE) | Power Generation Plants | 2013-12-18 | 1,640,453.00 $ |
| TEİAŞ 8th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ESENBOĞA-OSTİM OSB-MAMAK-ANKARA ÇANKAYA-SANAYİ-KIRIKKALE) | Power Generation Plants | 2017-03-06 | 1,656,993.00 $ |
| TEİAŞ 8th REGIONAL DIRECTORATE | 6 ADET 154 KV TRAFO MERKEZİ İŞLETMESİ (ESENBOĞA-OSTİM OSB-MAMAK-ANKARA ÇANKAYA-SANAYİ-KIRIKKALE) | Power Generation Plants | 2020-04-29 | 150,160.00 $ |
| TEİAŞ 9. BÖLGE MÜDÜRLÜĞÜ | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ALTINEKİN, KONYA-2 , KONYA-1, KULU, KIZÖREN) | Power Generation Plants | 2015-08-04 | 1,351,850.00 $ |
| TEİAŞ 9. BÖLGE MÜDÜRLÜĞÜ | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ÇUMRA, KONYA-2 , KONYA-1, ERENKÖY GIS) | Power Generation Plants | 2018-11-26 | 287,519.00 $ |
| TEİAŞ 9. BÖLGE MÜDÜRLÜĞÜ | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ÇUMRA, KONYA-2 , KONYA-1, ERENKÖY GIS) | Power Generation Plants | 2019-12-25 | 55,490.00 $ |
| TEİAŞ 9. BÖLGE MÜDÜRLÜĞÜ | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ÇUMRA, KONYA-2 , KONYA-1, ERENKÖY GIS) | Power Generation Plants | 2020-02-27 | 54,120.00 $ |
| TEİAŞ 9. BÖLGE MÜDÜRLÜĞÜ | 4 ADET 154 kV TEİAŞ TRAFO MERKEZİNİN İŞLETMESİ- (ÇUMRA, KONYA-2 , KONYA-1, ERENKÖY GIS) | Power Generation Plants | 2020-04-29 | 102,134.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | H-268 REFERENCE 380 kV (2,1 km) DOUBLE CIRCUIT 3B 1272 MCM CONDUCTOR IZMIT 380 KV SS. CONNECTION OHTL | Power Transmission and Distribution Lines | 2013-04-30 | 2,652,570.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | H691 REFERANSLI 154 kV'LUK (~57,6 km) 1272 MCM KEPEZKAYA HADİM EİH TESİS İŞİ | Power Transmission and Distribution Lines | 2018-12-26 | 3,743,910.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | H.OPGW REFERANSLI MEVCUT EİHLERE TOPLAM ~2850 KM UZUNLUĞUNDA OPGW TESİSİNİN 25 KISIM HALİNDE TEKLİF BİRİM FİYATLI KOMPLE TESİS İŞİ (15. KISIM) (GİRESUN) | Power Transmission and Distribution Lines | 2020-10-13 | 449,316.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | H.OPGW REFERANSLI MEVCUT EİH LERE TOPLAM ~2850 KM UZUNLUĞUNDA OPGW TESİSİNİN 25 KISIM HALİNDE TEKLİF BİRİM FİYATLI KOMPLE TESİS İŞİ (16. KISIM) | Power Transmission and Distribution Lines | 2020-10-13 | 613,845.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | İTM.351 REFERANSLI 380 kV KEBAN ŞALT-2 TM YENİLEME YAPIM İŞİ | Substations | 2021-01-28 | 8,888,671.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | İTM.354 REFERANSLI 380 kV ERMENEK TM TEVSİAT (KOP) TAMAMLAMA YAPIM İŞİ | Substations | 2021-02-17 | 7,437,495.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | İNŞ.28 REFERANSLI “10 ADET YANGIN ÖNLEME VE YANGINDAN KORUNMA SİSTEMİ YAPIMI | Substations | 2022-03-03 | 4,018,800.00 $ |
| TEİAŞ GENEL MÜDÜRLÜĞÜ | H.755.T REFERANSLI 154 kV (-34,6 km) 2x1272 MCM İLETKENLİ İNTEPE RES BRŞ. N.ÇANAKKALE TM - BRŞ. N.LAPSEKİ TM EiH TASFİYE SONRASI BAKİYE İŞLERİ TEKLİF BİRİM FİYATLI KOMPLE TESİS İŞİ (ÇANAKKALE) | Power Transmission and Distribution Lines | 2023-01-05 | 7,358,462.00 $ |
| TEİAŞ GENERAL DIRECTORATE | İTM.309 REFERANSLI, 154 KV AYDIN BATI TM (YENİ) YAPIM İŞİ | Substations | 2020-03-03 | 3,523,610.00 $ |
| TEİAŞ GENERAL DIRECTORATE | İTM.312 REFERANSLI, 154 KV ELBEYLİ TM (YENİ) YAPIM İŞİ | Substations | 2020-08-25 | 3,710,201.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ADANA -CİHADİYE OTL OPGW INSTALLATION (1200m FIBER OPGW) | Power Transmission and Distribution Lines | 2004-07-23 | 6,470.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 2X3X795 MCM İLETKENLİ ADANA -OSMANİYE 154 KV EİH (20 km) | Power Transmission and Distribution Lines | 2008-08-20 | 2,837,580.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 154kV MANCARLIK-KEPEZ OVERHEAD TRANSMISSION LINE (5 KM 2*1272 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2007-10-31 | 820,814.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H-411 REFERANS NO.LU - 154KV 26,5 KM TEK DEVRE 1272 MCM İLETKENLİ VARSAK-SERİK EİH | Power Transmission and Distribution Lines | 2012-12-04 | 1,838,560.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.673 Referanslı (~25 km) 154 kV 1272 MCM İletkenli Burdur-Akyaka EİH + (~1,5 km) 154 kV 2x1272 MCM İletkenli Bucak-Burdur 2 EİH Teklif Birim Fiyatlı Komple Tesis İşi | Power Transmission and Distribution Lines | 2018-09-13 | 1,488,220.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.461 referanslı 154 kVluk (71,2 km) si Tek Devre ve (31,8 km) si Çift Devre 1272 MCM İletkenli ÇAN-ÇANAKKALE E.İ.Hattı | Power Transmission and Distribution Lines | 2013-10-07 | 8,168,000.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 400 kV 3B 1272 MCM Aşağıkaleköy-Batman 2 E.İ. Hattının 120 ve 171 nolu direklerinin yeniden tesisi ile hattın geçici kabul eksikliklerinin tamamlanması | Power Transmission and Distribution Lines | 2019-10-07 | 112,141.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.272 Referanslı 380 kVluk (51,5 km) 3B 1272 MCM İletkenli KAHRAMANMARAŞ-GAZİANTEP 2 380 TM E.İ. HattI | Power Transmission and Distribution Lines | 2013-07-31 | 7,695,580.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.585 referanslı, 154 kV'luk (~23,3 km) 1272 MCM iletkenli Çırçıp-Telhamut (Yenileme) EİH ve 154 kV’luk (~8,7 km) 2X1272 MCM iletkenli 154 kV Belkıs-Birecik (Yenileme) EİH | Power Transmission and Distribution Lines | 2016-09-02 | 2,095,505.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H.312 referanslı 380 kV'luk İzmir Havza TM İrtibat Hatları, 154 kV'luk (Bornova-Manisa)BrşN-Morsan EİH, 380 kV'luk Bornova 380 GIS İrtibat Hatları ve Bornova 380-Karşıyaka BrşN EİH Tesisi İşi | Power Transmission and Distribution Lines | 2016-11-07 | 5,124,850.00 $ |
| TEİAŞ GENERAL DIRECTORATE | H-573 T ref 154 kV'luk Kahramanmaraş 380 TM 154 kV İrtibatları EİH (12,2 KM), 154 kV'luk KMaraş 154Kılılı BrşNKMaraş 380 EİH ( 3,5 KM), 154 kV'luk Mersin 380 TM Kadıncık II HES TM EİH (3 KM), 154 kV'luk Mersin 380Karacailyas BrşN Kadar (Yenileme) Eİ | Power Transmission and Distribution Lines | 2016-08-26 | 2,686,207.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 154kV ÇUMRA-GÜNEYSINIR OVERHEAD TRANSMISSION LINE (30KM 1272 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2008-01-29 | 2,298,010.00 $ |
| TEİAŞ GENERAL DIRECTORATE | 154 KV 1272 MCM İLETKENLİ SORGUN BOĞAZLAYAN EİH (75 KM) | Power Transmission and Distribution Lines | 2009-07-15 | 4,078,760.00 $ |
| TEİAŞ GENERAL DIRECTORATE | İTM.269, 2 Adet 154 kV Trafo Merkezi (154 KV KAHTA TM, 154 KV KARAKÖPRÜ TM) Yapımı | Substations | 2018-10-18 | 7,293,260.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 78 - 154 KV GERCÜŞ TM YAPIM İŞİ | Substations | 2012-10-01 | 1,925,210.00 $ |
| TEİAŞ GENERAL DIRECTORATE | İTM.92 - 154 kV KASTAMONU TM YAPIM İŞİ | Substations | 2013-07-16 | 563,455.00 $ |
| TEİAŞ GENERAL DIRECTORATE | ITM 82 REFERANSLI - 380 KV EREĞLİ TM YAPIM İŞİ | Substations | 2012-10-31 | 2,080,230.00 $ |
| UHUD ENERJİ ÜRETİM A.Ş. | GÖKGEDİK HES-ANDIRIN TM 2X477 MCM ENH (20 KM) | Power Transmission and Distribution Lines | 2011-01-03 | 1,106,800.00 $ |
| ULUDAĞ ELECTRICITY DISTRUBITION INC. | GÖNEN AG-OG ŞEHİR ŞEBEKESİ TESİSİ İŞİ | Highway, Tunnel and City Lighting | 2010-01-04 | 447,909.00 $ |
| ULUDAĞ ELECTRICITY DISTRUBITION INC. | MARMARA-AVŞA ISLAND REPAIR AND MAINTENANCE | Maintenance, Failure-Repair | 2008-03-24 | 1,041,880.00 $ |
| YEŞİLIRAK ELEKTRİK DAĞITIM A.Ş. CORUM PROVINCIAL DIRECTORATE | ÇORUM LV-MV ELECTRICITY NETWORK FACILITY | City and Rural Electricity Distribution Networks | 2006-02-14 | 5,105,216.00 $ |
| YEŞİLIRAK ELEKTRİK DAĞITIM A.Ş. CORUM PROVINCIAL DIRECTORATE | ÇORUM ALACA VE UĞURLUDAĞ ENH'LARI | Power Transmission and Distribution Lines | 2009-06-25 | 498,140.00 $ |
| YEŞİLIRAK ELEKTRİK DAĞITIM A.Ş. CORUM PROVINCIAL DIRECTORATE | 2PIECES CIRCUIT BREAKER MEASURE CABIN 1 PIECE OTL T-2007-06 DISTRIBUTION CENTERS WORK | Power Transmission and Distribution Lines | 2007-08-09 | 284,604.00 $ |
| YEŞİLIRAK ELEKTRİK DAĞITIM A.Ş. ÇORUM REGIONAL OFFICE | MERKEZ-MECİTÖZÜ LV-MV MAINTENANCE REPAIR WORK | Maintenance, Failure-Repair | 2006-07-26 | 117,761.00 $ |
| YEŞİLIRAK ELEKTRİK DAĞITIM A.Ş. ÇORUM REGIONAL OFFICE | 3 PIECES CIRCUIT BREAKER MEASURE CABIN DISTRIBUTION CENTERS WORK | Power Transmission and Distribution Lines | 2006-08-29 | 234,327.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM İLİ KÜÇÜK VE ACİL TESİS YAPIM İŞLERİ | Highway, Tunnel and City Lighting | 2013-07-09 | 445,126.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM I GRUP TESİS YAPIM İŞLERİ | Highway, Tunnel and City Lighting | 2014-05-13 | 3,202,720.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM İLİ KÜÇÜK VE ACİL TESİS YAPIM İŞLERİ -2014 | Highway, Tunnel and City Lighting | 2014-05-13 | 811,277.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM İLİ KÜÇÜK VE ACİL TESİS YAPIM İŞLERİ -2015 | Highway, Tunnel and City Lighting | 2015-05-04 | 273,200.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM İLİ KÜÇÜK VE ACİL TESİS YAPIM İŞLERİ | City and Rural Electricity Distribution Networks | 2013-07-09 | 525.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | 2017 YATIRIM PROJESİ SAMSUN-3 YAPIM İŞİ | Highway, Tunnel and City Lighting | 2017-05-08 | 5,086,687.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM I GRUP TESİS YAPIM İŞLERİ | Operation of Substations | 2015-05-04 | 2,241,084.00 $ |
| YEŞİLIRMAK ELECTRICITY DISTRUBITION CO. | ÇORUM I GRUP TESİS YAPIM İŞLERİ | Highway, Tunnel and City Lighting | 2013-07-09 | 2,404,707.00 $ |
| YEŞİLIRMAK ELEKTRİK DAĞITIM A.Ş. CORUM PROVINCIAL DIRECTORATE | OBRUK HEPP TS DODURGA-OSMANCIK OVERHEAD TRANSMISSION LINE (34KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2008-01-18 | 1,223,020.00 $ |
| YEŞİLYURT ENERJİ ELEKTRİK ÜRETİM A.Ş. | 154kV SAMSUN I TM - SAMSUN III TM ARASI (14.5KM) ÇİFT DEVRE 1272 MCM İLETKENLİ EİH | Power Transmission and Distribution Lines | 2012-10-02 | 2,650,298.00 $ |
| YİBİTAŞ ÇİMENTO SANAYİ VE İŞLETME A.Ş. | ÇİMPOR TM İŞLETMESİ | Substations | 2009-09-14 | 116,532.00 $ |
| ÇAMLIBEL ELEKTRİK DAĞITIM A.Ş. YOZGAT PROVINCIAL DIRECTORATE | YİBİTAŞ YOZGAT OVERHEAD TRANSMISSION LINE (13KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2006-09-15 | 1,669,940.00 $ |
| ÇORUH ELECTRICITY DISTRIBUTION INC. PROVINCIAL DIRECTORATE OF GÜMÜŞHANE | INSTALLATION OF TEKKE-KELKİT OVERHEAD LINE (38,6KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2005-12-07 | 1,618,330.00 $ |
| ÇİMSA ÇİMENTO SANAYİ VE TİCARET A.Ş. | 1 ADET 154 kV ÇİMSA ESKİŞEHİR FABRİKASI TM | Operation of Substations | 2022-03-07 | 106,294.00 $ |
| ÇİMSA ÇİMENTO SANAYİ VE TİCARET A.Ş. | 1 ADET 154 kV ÇİMSA NİĞDE FABRİKASI TM (NİĞDE) | Operation of Substations | 2022-03-07 | 106,294.00 $ |
| ÖZALTIN OTEL İŞLETMELERİ A.Ş. | 154 kV ÖZALTIN OTEL GES TRAFO MERKEZİ YAPIM İŞİ | Substations | 2023-02-14 | 3,250,000.00 $ |
| ÖZALTIN OTEL İŞLETMELERİ A.Ş. | 154 kV TEK DEVRE1272 MCM ÖZALTIN GES TM İRTİBAT HATLARI YAPIM İŞİ | Power Transmission and Distribution Lines | 2023-06-15 | 495,000.00 $ |
| ÖZALTIN İNŞAAT A.Ş. | 154 kV YEDİSU - ÖZLÜCE (BİNGÖL) ENERJİ İLETİM HATTI (36 KM 2X1272 MCM İLETKENLİ)+34,5 KV YEDİSU - KIĞI ENERJİ NAKİL HATTI (2X477 MCM İLETKENLİ 5KM) | Power Transmission and Distribution Lines | 2010-06-17 | 4,287,080.00 $ |
| ÖZGÜR ELECTRICITY PRODUCTION INC. | TAHTA HEPP-ANDIRIN TRANSFORMATOR SUBSTATION OVERHEAD TRANSMISSION LINE (10,5KM 2*477 MCM CONDUCTOR) | Power Transmission and Distribution Lines | 2006-04-05 | 410,969.00 $ |
| ÖZGÜR ELEKTRİK A.Ş. (BM MÜHENDİSLİK) | 3X477 MCM İLETKENLİ AZMAK HES I-AZMAK HES II- KİRPİLİK HES ENH TESİSİ (8km) | Power Transmission and Distribution Lines | 2009-05-04 | 346,740.00 $ |
| İÇTAŞ İNŞAAT A.Ş. | NİKSAR HES 154 KV 1X1272 MCM EİH (4 KM) | Power Transmission and Distribution Lines | 2011-02-09 | 374,698.00 $ |
| İÇTAŞ İNŞAAT A.Ş. | KEMERÇAYIR-HAYRAT TM ÜÇHANLAR-HAYRAT TM ÜÇHARMANLAR-HAYRAT TM ENH İŞİ | Power Transmission and Distribution Lines | 2011-07-18 | 1,061,510.00 $ |